01
Ventilated facades
A coordinated cladding, cavity, insulation and substructure solution adapted to the project.
New build and refurbishment, subject to technical review.
We coordinate cladding, substructure and applicable engineering, with clearly identified limits and responsibilities.
The solution does not start with an isolated product. It starts with loads, substrate, geometry, interfaces and the construction programme.
01
A coordinated cladding, cavity, insulation and substructure solution adapted to the project.
New build and refurbishment, subject to technical review.
02
Coordination of MARROB cladding, substructure and approved documentation.
For projects with a defined supply scope and programme.
03
Study of interfaces, formats, setting-out and special pieces to suit the architectural design.
Manufacturing and engineering validation required.
Final selection, calculations, anchors and documentation depend on project review and the applicable regulations.
Send drawings, location, stage and approximate area. We will review the information before proposing the next step.